eATM Portal

FCM04.1 — Short Term ATFCM Measures (STAM) - Phase 1

The rigid application of ATFM regulations based on standard capacity thresholds as the predominant tactical capacity measure needs to be replaced by a close working relationship between ANSP/FMP, AU and NMF, which would monitor both the real demand, the effective capacity of sectors having taken into account the complexity of expected traffic situation.

In order to close the gap between ATC and ATFCM, local operational procedures need to be developed. The aim is to improve the efficiency of the system using flow management techniques close to the real time operations with direct impact on tactical capacity management, occupancy counts and tactical action on traffic. The target of the short term ATFCM measures (STAM) is to replace en-route CASA regulations for situations where the capacity is nominal.

This objective deals with the initial version of STAM already deployed in some FMPs following some operational experimentations which is labelled STAM phase 1. A more automated version of STAM labelled STAM phase 2 will be released in the next years by SESAR. The deployment of STAM phase 1 is expected to happen only in selected core area FMPs. Once released, STAM Phase 2 will be deployed ECAC wide or at least in the high complexity ACCs.

Airports can be involved in the STAM process but the decision to involve them is a local decision

NOTE FOR MILITARY AUTHORITIES: It is the responsibility of each military authority to review this Objective IN ITS ENTIRETY and address each of the SLoAs that the military authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SLoAs which identify actions EXCLUSIVE to military authorities.

Edition
2022
Stakeholders
Air Navigation Service Provider / Airspace Users / Network Manager
Type
SESAR
Scope
Multi-National
Status
Achieved

Context

Related Elements

Applicability Area(s) and Timescales

Applicability Area:
Austria, Belgium, Bosnia and Herzegovina, Croatia, Czech Republic, France, Germany, Hungary, Italy, Maastricht UAC, Poland, Slovak Republic, Slovenia, Spain, Switzerland, United Kingdom
Timescales From By Applicable to
Initial operational capability 01-09-2013 - Applicability Area
Full operational capability - 31-10-2017 Applicability Area

Links to SESAR Solutions

Links to PCP ATM Sub-Functionalities

ICAO Block Modules: No associated data

References

Applicable legislation
Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project
Applicable ICAO Annexes and other references
None
Deployment Programme 2022
-
Operating Environments
Terminal Airspace
En-Route
Network

Expected Performance Benefits

Safety
Some enhancement through the prevention of overloads.
Capacity
Sector occupancy counts are used to identify 'hotspots' where action can be taken to reduce traffic complexity. This results in a streamlined ATCO workload, thus improving capacity and safety.
Operational efficiency
-
Cost efficiency
-
Environment
-
Security
-
  Code Title From By Related Enablers
 
REG01 Review, as appropriate, the safety argument of the changes imposed by the implementation of Short Term ATFCM Measures Phase 1 DELETED
 
ASP01 Availability of demand-capacity balancing tools via CHMI FINALISED
 
ASP02 Provision of ANSPs sector and traffic occupancy parameters data to NM FINALISED
 
ASP03 Implement FCM Procedures to enable application of flow management techniques on traffic streams closer to real-time and including more accurate assessment of forecast sector loads and cooperative management of groups of sectors and ATCO resources. FINALISED
 
ASP04 Develop, and deliver as necessary, a safety assessment of the changes imposed by the implementation of Short Term ATFCM Measures Phase 1 FINALISED
 
USE01 Availability of demand-capacity balancing tools FINALISED
 
NM01 Develop and implement demand-capacity balancing tools via CHMI FINALISED
 
NM02 Integration of ANSPs sector and traffic occupancy parameters data into NM systems FINALISED
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FCM04.1
 
20130901_20171031
REG01 (DELETED)
20130901_20151231
ASP01 (FINALISED)
20130901_20171031
ASP02 (FINALISED)
20130901_20171031
ASP03 (FINALISED)
20130901_20171031
ASP04 (FINALISED)
20130901_20171031
USE01 (FINALISED)
20130901_20171031
NM01 (FINALISED)
20120301_20120331
NM02 (FINALISED)
20130901_20171031

Supporting Material

Title Related SLoAs

Consultation & Approval

Working Arrangement in charge
NETOPS
Outline description approved in
03/2013
Latest objective review at expert level
05/2013
Commitment Decision Body
Provisional Council (PC)
Objective approved/endorsed in
07/2013
Latest change to objective approved/endorsed in
06/2019