Essential Operational Changes

This 2020 edition of the European ATM Master Plan introduces nine new Essential Operational Changes top-down as nine essential “game changers”. They are shown here and they are triggering structural evolutions of the European ATM, that are required to deliver the SESAR vision, up to and including its phase C and the “digital European sky” enabling the delivery of the Single European Sky’s objective to implement “more sustainable and better performing aviation”. More...

The EOCs are not independent from each other. In particular, some of them are closely linked to delivering the en-route performance and have been driving the definition of the target architecture, while others bring the essential changes in the other parts of the system.

For learning more about the new Essential Operational Changes, the Chapter 4.2 of the European ATM Master Plan document refers.

Each EOC is supported by SESAR Deployment Scenarios containing solutions contributing to their achievement.

Select from the drop-down menu the Essential Operational Change. Hovering with the mouse over a Deployment Scenario will display further details on it, hovering over a timeline bar will show the associated dates.

This Essential Operational Change covers both changes to operations at Airports and TMA airspace that allow maintenance of operational capacity under limiting conditions and changes that allow increase in operational capacity during normal Operations. This includes enhancements to planning and execution of operations at/around the airport like traffic sequencing, reduced separation, reduced and more predictable runway occupancy time and enhanced management of taxiway throughput, for both arrivals and departures. This EOC addresses as well the needed coordination with TMA operations where aircraft sequencing towards the runway begins and even further with extended arrival management (E-AMAN) in en-route airspace. It also includes solutions that enhance the safety of operations and addresses as well the reduction of the environmental impact at or near airports. Enhanced navigation and accuracy in low visibility conditions on the airport surface needs to be made possible by the introduction of new airborne and CNS capabilities.

Deployment Scenario Timeline Solution Solution V3 Gate
 20192020202120222023202420252026202720282029203020312032203320342035
1. In deployment phase: Key SESAR Solution
Airport safety nets vehicle
#04 -
Enhanced AMAN/DMAN integration
#54 -
Enhanced airport safety nets
#01 -
Integrated surface management
#47 -
2. In development phase: Key Solutions Approaching Maturity
Efficient aircraft separation during take-off and final approach
PJ.02-01 -
PJ.02-03 -
Enhanced arrival procedures
PJ.02-02 -
Enhanced visual operations
PJ.03a-04 -
Traffic alerts for pilots for airport operations
PJ.03b-05 -
Traffic optimisation on single- and multiple-runway airports
PJ.02-08 -
3. In development phase: Key R&D Activities
Advanced geometric GNSS-based procedures in TMAs
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
PJ.01-03A -
PJ.02-11 -
PJ.02-W2-04 -
Digital evolution of integrated surface management
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
PJ.02-W2-21 31-12-2022
PJ.03a-01 -
PJ.03b-01 -
Dynamic extended TMAs for advanced CCO/CDO and improved arrival and departure operations
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
PJ.01-02 -
PJ.01-03B -
PJ.01-W2-08 31-12-2022
Evolution of separation minima for increased runway throughput
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
PJ.02-W2-14 31-12-2022
Next generation AMAN for a 4D environment
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
PJ.01-01 -
PJ.01-W2-01 31-12-2022
4. Additional SESAR Solutions in deployment
AMAN and point merge
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
#108 -
Arrival management into multiple airports
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
#08 -
Continuous descent operations (CDO)
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
#11 -
D-TAXI service for CPDLC application
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
#23 -
De-icing management tool
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
#116 -
Enhanced ground controller situation awareness in all weather conditions
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
#70 -
Point merge in complex TMA
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
#107 -
Reducing landing minima in low visibility conditions using enhanced flight vision systems (EFVS)
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
#117 -
Virtual block control in LVPs
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
#48 -
5. Additional R&D Activities in development
Approach improvement through assisted visual separation
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
PJ.01-07 -
E-AMAN service
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
PJ.15-02 20-12-2019
Enhanced airport safety alerts for controller and pilot
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
PJ.03b-03 -
Enhanced navigation and accuracy in low-visibility conditions on airport surfaces
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
PJ.03a-03 -
Improved access to secondary airports
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
PJ.02-06 -
PJ.02-W2-17 31-12-2022
Safety support tools for runway excursions
Not Available - To be defined when Solution reaches MP Category
2. In development phase: Key Solutions Approaching Maturity
PJ.02-W2-25 31-12-2022
PJ.03b-06 -