eATM Portal

Deployment Scenario Title

Optimised low-level IFR routes for rotorcraft

Deployment Scenario Description Optimised low-level IFR routes for rotorcraft: currently, GNSS technology enhanced by SBAS systems (without ground infrastructure), which provide the required integrity for GNSS signals, identifies the availability of specific IFR routes, with improved accuracy, reliability and accessibility, to enable rotorcraft operators to access controlled airspace. Furthermore, the ICAO PBN concept, owing to the development of the RNP1/RNP0.3 navigation applications, makes a wide range of benefits available, with the aim of enhancing rotorcraft operations and integrating them into the future ATM system.
Essential Operational Change Multimodal Mobility and integration of all Airspace Users
Maturity In deployment phase: Key SESAR Solution
Applicable Operating Environment
Airport Terminal Airspace En-Route Network
       
Timeline
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Deployment              
Benefit          
Performance Contribution of the DS
Capacity Safety Environment Cost-efficiency Operational efficiency
         
Stakeholders affected (at least one enabler to be deployed)
ANSP AO AU Network Manager
Civil Military Civil Military Civil Military
APP, ENR, MET APP, ENR, MET Scheduled, BA Fixed, BA Rotorcraft, GA, FOC  
SESAR Solutions
Solution Code Solution Title Solution Description Related Elements
#113 Optimised low-level instrument flight rules (IFR) routes for rotorcraft Usually the rotorcraft operators have to face significant weather and terrain-related challenges...
Operational Improvement Steps
OI Step Code OI Step Title OI Step Description Related Elements
AOM-0810 Integration into the TMA route structure of optimised Low Level IFR route network for rotorcraft using RNP-1/RNP-0.3 In controlled airspace (TMA) Rotorcraft low altitude RNP-1/RNP-0.3 IFR routes are strategically...
Enablers
Required/
Optional
New/
Inherited
Develop/
Use
Enabler Code Enabler Title Enabler Description Related Elements
A/C-04b Flight management and guidance for RNP 0.3 (Category H(rotorcraft)) in all phases of flight, except final approach and initial missed approach The helicopter community identified a need for a specification that has a single accuracy of...
PRO-258 ATC procedure to handle low level IFR routes for rotorcraft Design of ATC routes (low level IFR routes) to manage the climbing and descending flows from and...
METEO-05b Generate and provide MET information relevant for TMA and En-route related operations (PCP) ATM-MET system acquiring, generating, assembling and providing Meteorological (MET) information...