eATM Portal

AOM19.1 — ASM Support Tools to Support Advanced FUA (AFUA)

Deploy Airspace Management (ASM) support systems (LARA or locally developed) and their interoperability with NM systems to manage airspace reservations (ARES) resulting from civil-military co-ordination, more flexibly according to airspace users' needs.
The automated ASM support system shall:
- enable the improvement of airspace management processes, including timing dimension by providing mutual visibility on civil and military requirements;
- support a flexible airspace planning taking into account ATS units' airspace management functions and airspace users' requirements, allowing also cross-border and segregated operations with optimized impact;
- support dynamic airspace management;
- address strategic, pre-tactical planning and tactical operations;
- be compatible for the sharing of real-time airspace status requirements and possibly provide data for impact assessment of airspace configurations;
- be interoperable with NM systems using AIXM 5.1 (Aeronautical Information Exchange Model);
- include a verification process for automated data exchange.

This objective is an enabler for its successors AOM19.2, AOM19.3 and AOM19.4 and, in turn, for ATM sub-functionality 3.1 (Airspace Management and Advanced Flexible Use of Airspace) of the PCP Regulation.

NOTE FOR MILITARY AUTHORITIES: It is the responsibility of each military authority to review this Objective IN ITS ENTIRETY and address each of the SLoAs that the military authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SLoAs which identify actions EXCLUSIVE to military authorities.

Edition
2022
Stakeholders
Air Navigation Service Provider / Network Manager
Type
PCP
Scope
ECAC+
Status
Removed

Context

Applicability Area(s) and Timescales

Applicability Area:
All ECAC States except: Armenia, Azerbaijan, Luxembourg, Malta, Moldova, North Macedonia, Sweden. Plus: Israel, Morocco
Timescales From By Applicable to
Initial operational capability 01-01-2011 - Applicability Area
Full operational capability - 01-01-2022 Applicability Area

Links to PCP ATM Sub-Functionalities

References

Applicable legislation
- Regulation (EC) No 2150/2005 of 23 December 2005 on Implementation and Application of the Flexible Use of Airspace
- Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project
Applicable ICAO Annexes and other references
None
Deployment Programme 2022
-
Operating Environments
Terminal Airspace
En-Route
Network

Expected Performance Benefits

Safety
Improved through better co-ordination of civil and military airspace needs at the European Network level and through a shared real-time airspace status display and enhanced, common situational awareness of all players.
Capacity
Increased through better awareness and utilization of airspace resources within and across airspace boundaries leading to reduction of flight delays.
Operational efficiency
Increased through the availability of more optimum routes/trajectories allowing lower fuel burn.
Cost efficiency
-
Environment
Emissions reduced through the use of more optimum routes/trajectories.
Security
-
  Code Title From By Related Enablers
 
ASP01 Deploy automated ASM support systems
  • 01-01-2011
  • 01-01-2022
 
ASP02 Implement interoperability of local ASM support system with NM system
  • 01-01-2011
  • 01-01-2022
 
ASP03 Improve planning and allocation of airspace booking
  • 01-01-2011
  • 01-01-2022
 
NM01 Integrate local ASM support systems with NM system
  • 01-01-2011
  • 01-01-2022
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AOM19.1
 
20110101_20220101
ASP01
 
20110101_20220101
ASP02
 
20110101_20220101
ASP03
 
20110101_20220101
NM01
 
20110101_20220101

Supporting Material

Title Related SLoAs

EUROCONTROL - Advanced FUA Concept - Edition 1.0

http://www.eurocontrol.int/sites/default/files/publication/files/advanced-fua-concept-v1.0-sept-2015.pdf

ASP01, ASP02, ASP03, NM01

EUROCONTROL - Civil-military ATM Performance Framework - V1.0

http://www.eurocontrol.int/publications/civil-military-atm-performance-framework

ASP03

EUROCONTROL - European Route Network Improvement Plan (ERNIP) Part 3 - Airspace Management Handbook - Guidelines for Airspace Management - 5.5 / 11/2017

https://www.eurocontrol.int/publication/european-route-network-improvement-plan-ernip-part-3

ASP01, ASP02, ASP03, NM01

EUROCONTROL - LARA (Local and sub-Regional Airspace Management Support System)

https://www.eurocontrol.int/software/local-and-sub-regional-airspace-management-support-system

ASP01, ASP02, NM01

EUROCONTROL - NM B2B Airspace Services Reference Manual

https://www.eurocontrol.int/service/network-manager-business-business-b2b-web-services

ASP02

EUROCONTROL - SPEC 166 - EUROCONTROL Specification for Airspace Management (ASM) Support System Requirements supporting the ASM processes at local and FAB level Part I - Baseline Requirements - Edition 1.0 / 09/2017

https://www.eurocontrol.int/publication/eurocontrol-specification-airspace-management-asm-support-system-requirements

ASP01, ASP02, ASP03, NM01

EUROCONTROL - SPEC-112 - EUROCONTROL Specification for the application of the Flexible Use of Airspace (FUA) - Edition 1.1 / 01/2009

https://www.eurocontrol.int/publication/eurocontrol-specification-application-flexible-use-airspace-fua

ASP01, ASP02, ASP03

EUROCONTROL - SPEC-179 - EUROCONTROL Specification for Airspace Management (ASM) Support System Requirements supporting the ASM processes at local and FAB level Part II ASM to ASM Systems Interface Requirements - 1.0 / 01/2020

https://www.eurocontrol.int/publication/eurocontrol-specification-airspace-management-asm-support-system-requirements

ASP01, ASP02, ASP03, NM01

Consultation & Approval

Working Arrangement in charge
NETOPS
Outline description approved in
-
Latest objective review at expert level
05/2021
Commitment Decision Body
Provisional Council (PC)
Objective approved/endorsed in
09/2016
Latest change to objective approved/endorsed in
-