eATM Portal

NAV03.2 — RNP 1 in TMA Operations

Performance-based navigation distinguishes between RNAV and RNP Specifications, both of which rely on area navigation techniques which allow aircraft to operate on any desired flight path within the coverage of station-referenced navigation aids or within the limits of the capability of self-contained aids, or a combination of these. An RNP 1 specification allows an aircraft to fly a specific path between two 3D-defined points in space; to this end, the RNP 1 specification requires a lateral performance accuracy of +/- 1NM 95% of the flight time, on-board performance monitoring, alerting capability and high integrity navigation databases.

Where ANS providers have established SID or STAR and where higher performance requirements than those of RNAV 1 are required in order to maintain air traffic capacity and safety in environments with high traffic density, traffic complexity or terrain features, they shall implement those routes in accordance with the requirements of the RNP 1 specification, including one or more of the following additional navigation functionalities:

(a) operations along a vertical path and between two fixes and with the use of:
(i) an ‘AT’ altitude constraint;
(ii) an ‘AT or ABOVE’ altitude constraint;
(iii) an ‘AT or BELOW’ altitude constraint;
(iv) a ‘WINDOW’ constraint;

(b) the radius to fix (RF) leg.

Establishment of RNP1 SID or STAR is not imposed as obligatory requirement by the PBN Regulation (EU) 2018/1048 (business decision on having SID or STAR is up to an individual stakeholder). However, the PBN regulation does prescribe obligatory set of specifications to be complied with, where a stakeholder had decided to establish SID or STAR. Individual ANSPs, airports and aircraft operators outside of the Applicability Area 1 may implement this functionality on a voluntary basis. In this case they will need to evaluate the business case for the implementation of RNP 1 procedures according to local circumstances.

NOTE 1: System improvements for controller support tools which may be required are covered by other Implementation Objectives like ATC12.1 (MTCD, conflict resolution support info and MONA), ATC02.9 (STCA) and ATC02.8 (APW).

NOTE FOR MILITARY AUTHORITIES: It is the responsibility of each military authority to review this Objective IN ITS ENTIRETY and address each of the SLoAs that the military authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SLoAs which identify actions EXCLUSIVE to military authorities.

Edition
2022
Stakeholders
Regulator / Air Navigation Service Provider / Airspace Users
Type
SES
Scope
ECAC+
Status
Active

Context

Applicability Area(s) and Timescales

Applicability Area 1:
All EU SES States except: Estonia, Hungary, Latvia, Maastricht UAC, Malta, Portugal, Romania
(EU SES states instrument RWY ends.)
Applicability Area 2:
Albania, Bosnia and Herzegovina, Israel, Moldova, Montenegro, North Macedonia, Serbia, Türkiye, Ukraine, United Kingdom
(Other ECAC+ states instrument RWY ends, except those already listed in Applicability Area 1.)
Timescales From By Applicable to
Start 07-08-2018 - Applicability Area 1 + Applicability Area 2
One SID and STAR per instrument RWY, where established - 25-01-2024 Applicability Area 1
Locally determined number of RNP1 SID/STAR, where established. - 06-06-2030 Applicability Area 2
All SIDs and STARs per instrument RWY, where established - 06-06-2030 Applicability Area 1

Links to PCP ATM Sub-Functionalities

References

Applicable legislation
COMMISSION IMPLEMENTING REGULATION (EU) 2018/1048 of 18 July 2018 laying down airspace usage requirements and operating procedures concerning performance-based navigation
Applicable ICAO Annexes and other references
None
Deployment Programme 2022
-
Operating Environments
Terminal Airspace

Expected Performance Benefits

Safety
Increased situational awareness and indirect benefit to both ATC and pilot through reduction of workload during RNP operations.
Capacity
Increased capacity through efficient and improved systemisation of SID/STARs based on RNP 1, particularly on curved paths using Radius to Fix functionality.
Operational efficiency
Reduction in fuel burn and potential to reduce track miles through optimised TMA procedures using the Radius to Fix Functionality.
Cost efficiency
-
Environment
Emissions and noise nuisance reduced by use of optimal flight procedures and routings.
Security
-
  Code Title From By Related Enablers
 
REG01 Verify the transition plan for PBN in ANS provision
  • 03-12-2020
  • 06-06-2030
 
ASP01 Develop an airspace concept based on designated RNP 1 arrival and departure procedures with Radius to Fix (RF)
  • 01-01-2018
  • 25-01-2024
  • 06-06-2030
 
ASP02 Where necessary, provide appropriate navigation infrastructure to support RNP 1 operations including the infrastructure required for GNSS reversion
  • 01-01-2018
  • 06-06-2030
 
ASP03 Train air traffic controllers in RNP1 with Radius to Fix (RF) procedures
  • 01-01-2018
  • 06-06-2030
 
ASP04 Implement at least one RNP1 SID and STAR with radius to Fix (RF), per instrument RWY
  • 01-01-2018
  • 25-01-2024
  • 06-06-2030
 
ASP05 Develop a local safety assessment
  • 01-01-2018
  • 06-06-2030
 
ASP06 Establish the transition plan for PBN in ANS provision
  • 03-12-2020
  • 06-06-2030
 
ASP07 Implement all RNP1 SID and STAR with radius to Fix (RF), per instrument RWY
  • 07-08-2018
  • 06-06-2030
 
USE01 Install appropriate RNP 1 with Radius to Fix (RF) equipment
  • 01-01-2018
  • 06-06-2030
 
USE02 Train flight crews in RNP 1 TMA procedures
  • 01-01-2018
  • 06-06-2030
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NAV03.2
 
20180807_20240125_20300606_20300606
REG01
 
58%
20201203_20300606
ASP01
 
20%
20180101_20240125_20300606
ASP02
 
20%
20180101_20300606
ASP03
 
28%
20180101_20300606
ASP04
 
20%
20180101_20240125_20300606
ASP05
 
35%
20180101_20300606
ASP06
 
48%
20201203_20300606
ASP07
 
11%
20180807_20300606
USE01
 
20180101_20300606
USE02
 
20180101_20300606

Supporting Material

Title Related SLoAs

EASA - EASA Decision 2018/013/R - AMC & GM to Regulation (EU) 2018/1048 (PBN IR) – Annex II to EASA Decision 2018/013/R 11/2018

https://www.easa.europa.eu/sites/default/files/dfu/Annexes%20to%20EDD%202018-013-R.pdf

ASP01, ASP04, ASP06, ASP07, REG01

EC - COMMISSION IMPLEMENTING REGULATION (EU) 2017/373 - (OJ L 62, 8.03.2017, p. 1) - COMMISSION IMPLEMENTING REGULATION (EU) 2017/373 of 1 March 2017 laying down common requirements for providers of air traffic management/air navigation services and other air traffic management network functions and their oversight, repealing Regulation (EC) No 482/2008, Implementing Regulations (EU) No 1034/2011, (EU) No 1035/2011 and (EU) 2016/1377 and amending Regulation (EU) No 677/2011 03/2017

https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:32017R0373&from=EN

ASP05

EUROCONTROL - Air Navigation Systems Safety Assessment Methodology (SAM) - Version 2.1 / 11/2006

https://www.eurocontrol.int/tool/safety-assessment-methodology

ASP05

EUROCONTROL - Airspace Concept Handbook for the Implementation of Performance Based Navigation (PBN) - Edition 4.0 / 04/2021

https://www.eurocontrol.int/publication/airspace-concept-handbook-implementation-performance-based-navigation-pbn

ASP01, ASP04, ASP06, ASP07, REG01

EUROCONTROL - Distance Measuring Equipment Tracer (DEMETER) Tool - Version 1.0.4 / 01/2012

https://www.eurocontrol.int/online-tool/distance-measuring-equipment-tracer

ASP02

EUROCONTROL - GUID-114 - Guidelines for RNAV 1 Infrastructure Assessment - Edition 2.0 / 07/2021

https://www.eurocontrol.int/publication/eurocontrol-guidelines-rnav-1-infrastructure-assessment

ASP02

ICAO - Doc 4444 - Air Traffic Management - Edition 16 / 11/2016

https://store.icao.int/

ASP03

ICAO - Doc 7030 - Regional supplementary Procedures - Edition 5 / 07/2011

https://www.icao.int/EURNAT/Pages/EUR-and-NAT-Document.aspx

ASP01, ASP03, ASP04, ASP06, ASP07, REG01

ICAO - Doc 8168-Volume II - Aircraft Operations - Volume II - Construction of Visual and Instrument Flight Procedures - Edition 5 / 11/2011

https://store.icao.int/

ASP01, ASP03, ASP04, ASP06, ASP07, REG01, USE01

ICAO - Doc 9613 - Performance-based Navigation (PBN) Manual - Edition 4 / 03/2013

https://store.icao.int/en/performance-based-navigation-pbn-manual-doc-9613

ASP01, ASP02, ASP04, ASP06, ASP07, REG01, USE01, USE02

ICAO - Doc 9992 - Manual on the Use of Performance-based Navigation (PBN) in Airspace Design - First Edition / 01/2013

http://store1.icao.int/

ASP01, ASP04, ASP06, ASP07

Consultation & Approval

Working Arrangement in charge
NSG - Navigation Steering Group
Outline description approved in
-
Latest objective review at expert level
12/2018
Commitment Decision Body
Provisional Council (PC)
Objective approved/endorsed in
05/2019
Latest change to objective approved/endorsed in
05/2019