AOP05 — Airport Collaborative Decision Making (CDM)

Implement Airport CDM (A-CDM) to enhance the operational efficiency of airports and improve their integration into the Air Traffic Management Network (ATMN) while maintaining or improving the safety levels. These objectives are achievable by increasing the information sharing between the local ANSP, airport operator, aircraft operators, ground handlers, the NM and other airport service providers; and improving the cooperation between these partners to enhance the predictability of events and optimise the utilisation of resources therefore increase the efficiency of the overall system. .

The Airport CDM concept is built on the following elements:

- The foundations for Airport CDM are Information Sharing and the Milestone Approach. They consist in collaborative information sharing and monitoring of the progress of a flight from the initial planning to the take off. Those two elements allow the airport partners to achieve a common situational awareness and predict the forthcoming events for each flight.

- Variable Taxi Time Calculation, Collaborative Pre-Departure Sequencing (i.e. initial DMAN) and CDM in Adverse Conditions allow the airport partners to further improve the local management of airport operations, whatever the situation at the airport.

- Once A-CDM has been implemented locally, the link with the ATMN can be strengthened through the exchange of flight update messages between the CDM airport and the NM. This last building block of the A-CDM concept facilitates the flow and capacity management, helps reduce uncertainty and increases efficiency at the network level.

FOR MILITARY AUTHORITIES: It is the responsibility of each Military Authority to review this ESSIP Objective IN ITS ENTIRETY and address each of the SloAs that the Military Authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SloAs which identify actions EXCLUSIVE to MIL Authorities

Edition
2016
Stakeholders
Air Navigation Service Provider / Airport Operator / Airspace Users / Network Manager
Type
SESAR
Scope
Airport
Status
Active

Context

Related Elements

Applicability Area(s) and Timescales

Applicability Area:
See list of Airports in ESSIP Plan - Annex D
Timescales From By Applicable to
Initial operational capability 01-01-2004 Applicability Area
Full operational capability 31-12-2016 Applicability Area

Links to SESAR Solutions

Links to PCP ATM Sub-Functionalities

ICAO Block Modules

References

Applicable legislation
Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project
Applicable ICAO Annexes and other references
ICAO Annex 14 - Aerodromes
Deployment Programme 2016
Family 2.1.1 - Initial DMAN
Family 2.1.3 - Basic A-CDM
Operating Environments

Expected Performance Benefits

Safety
-
Capacity
Improved through optimal use of facilities and services, better use of airport and ATFM slots.
Operational efficiency
Improved system efficiency and predictability. Significant decrease in fuel burn through better timed operations.
Cost efficiency
Lower airspace user operating cost due to decrease in fuel costs and more accurate fleet predictions. Increased airport revenue through additional flights and passengers.
Environment
Reduced noise and emissions due to limiting engine ground running time due to better timed operations.
Security
N/A
  Code Title From By Related Enablers
 
ASP01 Define and agree performance objectives and KPIs at local level, specific to ANSP in accordance with A-CDM Manual guidelines
  • 01-01-2004
  • 31-01-2013
 
ASP02 Define and implement local Air Navigation Service (ANS) procedures for information sharing through Letters of Agreement (LoAs) and/or Memorandum of Understanding (MoU) in accordance with A-CDM Manual guidelines
  • 01-01-2004
  • 31-01-2013
 
ASP03 Define and implement local procedures for turnaround processes in accordance with CDM manual guidelines
  • 01-01-2004
  • 31-12-2016
 
ASP04 Continually review and measure airport performance in accordance with Airport CDM Manual guidelines
  • 01-01-2004
  • 31-01-2013
 
ASP05 Define and implement variable taxi-time and predeparture sequencing procedure (i.e. initial DMAN) according to airport CDM Manual guidelines
  • 01-06-2006
  • 31-12-2016
 
ASP06 Define and implement procedures for CDM in adverse conditions, including the de-icing according to airport CDM Manual guidelines
  • 01-01-2012
  • 31-12-2016
 
APO01 Define and agree performance objectives and KPIs at local level specific to airport operations in accordance with A-CDM Manual guidelines
  • 01-01-2004
  • 31-01-2013
 
APO02 Define and implement local airport operations procedures for information sharing through Letters of Agreement (LoAs) and/or Memorandum of Understanding (MoU) in accordance with A-CDM Manual guidelines
  • 01-01-2004
  • 31-01-2013
 
APO03 Define and implement local procedures for turnaround processes in accordance with CDM manual guidelines (baseline CDM)
  • 01-01-2004
  • 31-12-2016
 
APO04 Continually review and measure airport performance in accordance with Airport CDM Manual guidelines
  • 01-01-2004
  • 31-01-2013
 
APO05 Define and implement the exchange of messages, Flight Update Message (FUM) and Departure Planning Information (DPI) between NMOC and the airport in accordance with A-CDM Manual guidelines
  • 01-03-2005
  • 31-01-2014
 
APO06 Define and implement procedures for CDM in adverse conditions including the de-icing according to airport CDM Manual guidelines
  • 01-06-2006
  • 31-12-2016
 
USE01 Define and agree performance objectives and KPIs at local level, specific to aircraft operators, in accordance with A-CDM Manual guidelines
  • 01-01-2004
  • 31-01-2013
 
USE02 Define and implement local aircraft operators procedures for information sharing through LoAs and/or MoU in accordance with A-CDM manual guidelines
  • 01-01-2004
  • 31-01-2013
 
USE03 Define and implement local procedures for turnaround processes in accordance with A-CDM manual guidelines
  • 01-01-2004
  • 31-12-2016
 
USE04 Continually review and measure airport performance in accordance with Airport CDM Manual guidelines
  • 01-01-2004
  • 31-01-2013
 
USE05 Define and implement procedures for CDM in adverse conditions including the de-icing according to A-CDM Manual guidelines
  • 01-01-2012
  • 31-12-2016
 
NM01 Update NM systems and define procedures to support the exchange of messages, Flight Update Message (FUM) and Departure Planning Information (DPI) between NMOC and airports in accordance with A-CDM Manual guidelines FINALISED
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AOP05
 
20040101_20161231
ASP01
 
20040101_20130131
ASP02
 
20040101_20130131
ASP03
 
20040101_20161231
ASP04
 
20040101_20130131
ASP05
 
20060601_20161231
ASP06
 
20120101_20161231
APO01
 
20040101_20130131
APO02
 
20040101_20130131
APO03
 
20040101_20161231
APO04
 
20040101_20130131
APO05
 
20050301_20140131
APO06
 
20060601_20161231
USE01
 
20040101_20130131
USE02
 
20040101_20130131
USE03
 
20040101_20161231
USE04
 
20040101_20130131
USE05
 
20120101_20161231
NM01 (FINALISED)
20050301_20140131

Supporting Material

Title Related SLoAs

ETSI - EN 303 212 - Airport Collaborative Decision Making (A-CDM); Community Specification for application under the Single European Sky Interoperability Regulation EC 552/2004 - Ver. 1.1.1 - OJ 2010C168/04 / 06/2010

http://webapp.etsi.org/workprogram/SimpleSearch/QueryForm.asp

APO01, APO02, APO03, APO04, APO05, APO06, ASP01, ASP02, ASP03, ASP04, ASP05, ASP06, USE01, USE02, USE03, USE04, USE05

EUROCAE - ED-141 - Minimum Technical Specifications for Airport Collaborative Decision Making (Airport-CDM) Systems 10/2008

http://boutique.eurocae.net/catalog/index.php

APO01, APO02, APO03, APO04, APO05, APO06, ASP01, ASP02, ASP03, ASP04, ASP05, ASP06, USE01, USE02, USE03, USE04, USE05

EUROCAE - ED-145 - Airport-CDM Interface Specification 10/2008

http://boutique.eurocae.net/catalog/index.php

APO01, APO02, APO03, APO04, APO05, APO06, ASP01, ASP02, ASP03, ASP04, ASP05, ASP06, USE01, USE02, USE03, USE04, USE05

EUROCAE - ED-146 - Guidelines for Test and Validation Related to Airport CDM Interoperability 10/2008

http://boutique.eurocae.net/catalog/index.php

APO01, APO02, APO03, APO04, APO05, APO06, ASP01, ASP02, ASP03, ASP04, ASP05, ASP06, USE01, USE02, USE03, USE04, USE05

EUROCONTROL - Airport CDM Functional Requirements Document - 4.0 / 05/2009

http://www.euro-cdm.org/library_eurocontrol_implementation.php

APO01, APO02, APO03, APO04, APO05, APO06, ASP01, ASP02, ASP03, ASP04, ASP05, ASP06, USE01, USE02, USE03, USE04, USE05

EUROCONTROL - Airport CDM Implementation Manual - Edition 4.0 / 04/2012

http://www.eurocontrol.int/publications/airport-cdm-implementation-manual-version-4

APO01, APO02, APO03, APO04, APO05, APO06, ASP01, ASP02, ASP03, ASP04, ASP05, ASP06, USE01, USE02, USE03, USE04, USE05

Consultation & Approval

Working Arrangement in charge
Airport Operations Team (AOT)
Outline description approved in
Latest objective review at expert level
04/2012
Commitment Decision Body
Provisional Council (PC)
Objective approved/endorsed in
07/2003
Latest change to objective approved/endorsed in
07/2013