eATM Portal

Solution #55 — Precision approaches using GBAS CATII/III

This SESAR Solution aims at improving Low Visibility Operation using GBAS Cat II/III based on single frequency signals.
The main benefit is the increased runway capacity in poor weather conditions as the glide path and azimuth signals will face hardly any interference from previous landing aircraft or other obstacles. More sustained accuracy in aircraft guidance on final approach.
The GBAS (Ground Based Augmentation System) is a precision approach system relying on GNSS signals and composed of ground and airborne segments. GBAS supports enhanced level of service for all phases of approach, landing and departure.
GBAS CATII/III based on L1 single frequency signals is the outcome of the extensive work in SESAR WP9 and 15 in addition to project 6.8.5 involving main European ground systems manufacturers and airborne industry. The solution is based on the existing single frequency signals and is considered as an initial GBAS CAT II/III solution as the final solution should make use of multi-constellation multi-frequency signals.
The GBAS CATII/III L1 system should enable:
-Automatic Approach and Landing down to Cat IIIb minima for Mainline Aircraft
- Automatic roll-out, DH < 50 ft down to no DH & RVR between 50m and200m
-Automatic Approach and Landing down to Cat II or Cat IIIa minima for Business and Regional Aircraft
- 50 ft < DH < 200 ft & 200 m < RVR < 550m
- CAT IIIb considerations for Business Aircraft for possible future use
Guided take-off is integrated in the reflexion

Program
SESAR1
Need for coordination
Network
Related to
    -
Date V1 Gate
-
Date V2 Gate
-
Date V3 Gate
-
Deployment Start Date
31-12-2017
Benefits Start Date (IOC)
31-12-2025
Full Benefit Date (FOC)
31-12-2035

Operating Environments: No associated data

Phases: No associated data

SESAR Projects: No associated data

Operational Improvement Steps / Enablers

Code Dates Solution Data Quality Index : -
 
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
2026 26
2027 27
2028 28
2029 29
2030 30
2031 31
2032 32
2033 33
2034 34
2035 35
2036 36
2037 37
2038 38
2039 39
2040 40
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
#55
IOC - FOC
  AO-0505-A
 

PCP Elements: No associated data

Implementation Objectives

Code Title Related Elements
NAV11 Implement precision approach procedures using GBAS CAT II/III based on GPS L1

ICAO Block Modules