AO-0801-B — Collaborative Airport Planning Interface (AOP fully integrated with NOP & local business rules)

Maintenance of the evolving content of the Airport Operations Plan (AOP) including:
(1) the finalization of AOP-NOP information sharing that would ultimately lead the European standardization;
(2) the procedures to support AOP-NOP collaborative process, including AOP-NOP information quality requirements;
(3) the exchange of AOP-NOP information through SWIM, including cyber-security aspects;
(4) the integration of local business rules of the airports if and where necessary taking into account the airlines business priorities (Airport Impact Assessment - AOP logic).
The main performance improvements brought about by the above features will be better demand predictability so that TTOT adherence is improved which will lead to limited capacity degradation both at the airport and in the network. Delay reduction (especially the reactionary delay resulting from limited capacity degradation) improves resilience in times of disruption and therefore faster recovery to normal operations.

Rationale
Sharing of AOP with the Network is vital for having a complete picture of the expected time of traffic in the network. This include data to determine TOBT, TTA and the risk of changes to these time through use of UDPP in disruption and a measure of that disruption with the AIMA index. The operational issue is that for an efficient interface all nodes feeding into the NOP need a common data exchange in terms of parameters to be sent and data quality. The current limitation is that this is not understood and as a result data exchanged may not be reliable. In addition there is a need to ensure compatibility between Airport and NM Systems as well as improve the capability of those systems.
Forecast V3 end date
31-12-2022
Benefits start date (IOC)
31-12-2027
Full benefits date (FOC)
31-12-2031
Current Maturity Level
V2 finalised
Solution Data Quality Index
-
Current Maturity Phase
R&D
Scope
-
Release
-
PCP Status
-

Enablers

Code Dates
 
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
2026 26
2027 27
2028 28
2029 29
2030 30
2031 31
2032 32
2033 33
2034 34
2035 35
2036 36
2037 37
2038 38
2039 39
2040 40
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AO-0801-B
 
AIRPORT-02b
AIRPORT-03b
V4
V5
IOC - FOC
AOC-ATM-20
V4
V5
IOC - FOC
HUM-010
NIMS-25
V4
V5
IOC - FOC
NIMS-46
V4
V5
IOC - FOC
NIMS-48
V4
V5
IOC - FOC
NIMS-52
V4
V5
IOC - FOC
PRO-095
PRO-096
SWIM-APS-03b
SWIM-APS-04b
SWIM-INFR-05b
IOC - FOC

Dependent OI Steps

Relationship Code Title Related Elements
Has predecessor AO-0801-A Collaborative Airport Planning Interface

SESAR Solutions

PCP Elements: No associated data

Implementation Objectives: No associated data

ICAO Block Modules: No associated data